AUXEMA STEMMANN TAKES PART IN THE CONSTRUCTION OF MUELLE DE LEVANTE IN VALENCIA (SPAIN)


The Port Authority of Valencia invested 35.44 million of euros  during 2017, in Valencia Port; currently managed by APM Terminals.

This project served to enlarge the surface and facilities of the port.

Auxema Stemmann has been the executor of the crane´s cable trench in this project.

For the construction of this cable trench a new design has been used, which enables an installation time and cost reduction.

On the other hand, the structure and rubber (Beltflex system) coupling area has been reinforced avoiding any possible rubber belt (Beltflex system) connection bolt loosing.

In Auxema Stemmann we are compromised with staff security, that´s why we have optimized our cable trench protection system,BELTFLEX, adding black and yellow stripes as a precaution signal, in order to avoid any injury to staff.

 

 

Video of the installlation: https://youtu.be/9r_KLOJePxo


For more information about our cable trench systems, please contact us in comercial@auxema-stemmann.com